Abstract
SUMMARY The development of strategies for sequencing slabs through the reheat furnace and rolling mill of a modern steel production facility is complicated by multiple, and often conflicting production objectives. Optimal energy efficiency through the reheat furnace may lead to inefficient rolling sequences or less than desirable product delivery schedules. Not only is model formulation complicated, but the combinatorial nature of the problem precludes optimal solution. A heuristic procedure for solving this multi-objective product sequencing problem has been developed and tested under production conditions in a Danish steel mill. The methodology, which is based on a modified ‘greedy’ algorithm is presented and results using actual production data are discussed
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.