Abstract
In wells brought into production, the bottomhole formation zone is contaminated. Contamination must be eliminated by acid treatment. The degree of contamination depends on reservoir characteristics and technological parameters of the primary and secondary opening. The intervals of formation permeability were identified; additional measures aimed at cleaning the reservoir from contamination and restoring well productivity should be implemented. Multi-solution acid treatment of the bottomhole formation zone improves productive characteristics of wells with deteriorated properties of the bottomhole reservoir.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.