Abstract
LAPECR3 (Lanzhou All Permanent magnet Electron cyclotron Resonance ion source No. 3) had been developed as an ion injector of Heavy Ion Medical Machine (HIMM) accelerator facility since 2009. The first HIMM accelerator facility was built in Wuwei city in 2015, and the LAPCER3 ion source has delivered C5+ ion beam to HIMM for more than 1000 days in the past four years. In order to improve the performance of the LAPECR3 ion source for intense carbon beams production, continuous research and development work has been made. The recently developed LAPECR3 ion source together with the new low-energy beam transportation can provide better performance in terms of both beam intensity and quality. This paper will generally review the LAPECR3 ion source operation status for HIMM, and the recent improvement will be presented, especially the stable beams production of C4+ and C5+.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.