Abstract

Load shedding (LS) is one of the most important protection schemes to prevent system blackout. In the case of large disturbances, optimal LS in appropriate buses can effectively maintain the system stability. The higher complexity and lower predictability of modern power systems with high wind power penetration make it difficult to rely on conventional LS schemes, which shed a fixed, predetermined amount of load regardless of disturbance location. This study presents an intelligent LS scheme based on synchrophasor measurements that are adapted to both disturbance size and power system inertia. The proposed scheme utilises improved power flow tracing method to determine the amount and location of load curtailment considering power system constraints. The new method is successfully tested in the IEEE 39-bus system with high wind power penetration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.