Abstract

This article introduces introduces a new prefabricated and assembled steel structure system and its key construction technologies for repeated switching scenes in existing stadiums. This steel structure system follows the DfD design method, minimizing the volume of each group of structural member units and separating the connection interfaces between members. In order to improve the construction and assembly efficiency of all the structural components, this study establishes an assembly-oriented BIM model data system by adding customized attributes in the family library in Autodesk REVIT. By associating model attributes with on-site monitoring data of the construction process, this research realizes real-time acquisition and display of construction data of all components during the whole life cycle. At the same time, aiming at the requirements of high-precision positioning and digital dynamic monitoring in future on-site construction, this research proposes an innovative construction positioning monitoring method which combines motion capture system with traditional construction monitoring technology. By correcting the positioning data of motion capture system with traditional construction monitoring data, real-time dynamic monitoring of several monitoring points in a 12*15 m large site is realized and the measurement error is controlled within ±1 mm. This study takes the construction project of “ice-water conversion” from the main swimming pool of the National Swimming Center in the Summer Olympic Games to the curling venue of the Winter Olympic Games as an example to show the important role of relevant technology to improve the construction efficiency in the construction application for the renovation of existing Olympic venues.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call