Abstract

Large-scale power grids, especially smart grid systems, consist of a huge amount of complex computerized electronic devices, such as smart meters. A smart maintenance system is desired to schedule and send maintenance worker to locations where any computerized devices become faulty. A grid management system (GMS) is purposely designed in the way that the following three conditions are generally fulfilled: 1) all workers are working on full capacity everyday; 2) the highest severity level faulty devices are fixed the quickest; and 3) the overall traveling distance/time is minimized. In this study, two intelligent grid maintenance framework are proposed considering the above three conditioned based on two state-of-arts algorithms, namely, genetic algorithm and K-mediods clustering method, respectively. Five real-world datasets collected from five different local cities/counties in eastern China are adopted and applied to verify the effectiveness of the two proposed intelligent grid maintenance frameworks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.