Abstract

The careful integration of intelligent knowledge-based systems (IKBS) can help to solve the problem of growing planning and scheduling complexity. Based on the project we are conducting for a medium-sized high-tech manufacturing company, this article presents the first lessons we learned and the first results we got investigating practical applications of knowledge engineering. The following issues are considered: when did we find the knowledge engineering approach justified to solve planning and scheduling problems; what did we do to support a typical manufacturing decision like: “Do I make or do I buy a part”; how do we organize our projects and which tools are we using.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.