Abstract

Job shop scheduling belongs to the large class of NP-complete (nondeterministic polynomial time complete) problems and the complexity of job shop scheduling characterizes many real-life situations. In auto blanking plant, intelligent scheduling system is needed to deal with the automation of production. The core structure of job shop scheduling system is designed. The scheduling rules such as mission-critical priority rule, first come first serve rule, the highest task priority rule and the urgent tasks priority rule are built with the definitions of express tasks, urgent tasks, middle urgent tasks and normal tasks according to the time features of tasks. The heuristic optimization algorithm is designed to follow the above rules. The intelligent logistics management system is built to optimize job shop scheduling in auto blanking plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.