Abstract
Integrating ever increasing amount of renewable generating resources to interconnected power systems has created new challenges to the safety and reliability of today‟s power grids and posed new questions to be answered in the power system modeling, analysis and control. Automatic Generation Control (AGC) must be extended to be able to accommodate the control of renewable generating assets. In addition, AGC is mandated to operate in accordance with the NERC‟s Control Performance Standard (CPS) criteria, which represent a greater flexibility in relaxing the control of generating resources and yet assuring the stability and reliability of interconnected power systems when each balancing authority operates in full compliance. Enhancements in several aspects to the traditional AGC must be made in order to meet the aforementioned challenges. It is the intention of this paper to provide a systematic, mathematical formulation for AGC as a first attempt in the context of meeting the NERC CPS requirements and integrating renewable generating assets, which has not been seen reported in the literature to the best knowledge of the authors. Furthermore, this paper proposes neural network based predictive control schemes for AGC. The proposed controller is capable of handling complicated nonlinear dynamics in comparison with the conventional Proportional Integral (PI) controller which is typically most effective to handle linear dynamics. The neural controller is designed in such a way that it has the capability of controlling the system generation in the relaxed manner so the ACE is controlled to a desired range instead of driving it to zero which would otherwise increase the control effort and cost; and most importantly the resulting system control performance meets the NERC CPS requirements and/or the NERC Balancing Authority’s ACE Limit (BAAL) compliance requirements whichever are applicable.
Highlights
Recent years have witnessed the rapid development of smart grid technologies and remarkable progresses in their deployment to cope with the integration of distributed, renewable generating assets in fast growing quantities, which nowadays represent a significant amount of generating capacity of the entire system
Automatic Generation Control (AGC) is mandated to operate in accordance with the NERC‟s Control Performance Standard (CPS) criteria, which represent a greater flexibility in relaxing the control of generating resources and yet assuring the stability and reliability of interconnected power systems when each balancing authority operates in full compliance
The neural controller is designed in such a way that it has the capability of controlling the system generation in the relaxed manner so the area control error (ACE) is controlled to a desired range instead of driving it to zero which would otherwise increase the control effort and cost; and most importantly the resulting system control performance meets the NERC CPS requirements and/or the NERC Balancing Authority‟s ACE Limit (BAAL) compliance requirements whichever are applicable
Summary
Recent years have witnessed the rapid development of smart grid technologies and remarkable progresses in their deployment to cope with the integration of distributed, renewable generating assets in fast growing quantities, which nowadays represent a significant amount of generating capacity of the entire system. Wind turbines and solar photovoltaic (PV) units do not provide inertia, and do not have primary controllers (governors). Increasing wind and solar penetrations requires some conventional generators to shut down, and reduces the system inertia, reduce the system‟s frequency response to frequency deviations, and make it more difficult to stabilize the system frequency. Known as frequency response, occurs in the time scale of seconds following a change in system frequency to stabilize the system frequency. Secondary frequency control, used to restore the system frequency, is typically provided by AGC, which periodically executes every few seconds to compute area control error (ACE) based on the system frequency, actual net interchange, and scheduled net interchange; and determines the system‟s energy balance with its interconnection. Secondary frequency control must comply with the NERC standards [7]: CPS1, CPS2, DCS, BAAL compliance, and any others applicable
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.