Abstract

The GUPCO offshore structure management system was developed as a part of an integrated infrastructure management system. This paper presents a case study of providing an integrity management system for inspection, evaluation and repair of the fixed offshore platforms in Gulf of Suez. The management system procedure is presented focusing on the first step for defining the highly risky weight to the lower risky weight structure based on API criteria for assessment of the existing structures. The risk analysis methodology for developing design and assessment criteria for fixed offshore structure based on consequence of failure is illustrated. In our case study the assessment method is applied for a number of fixed offshore structures. The above methodology is performed after theoretical assessment and then verifying by using ROV subsea inspection for the fixed offshore structure. Comparison between the actual structure performance and the predicting risk assessment for the structure from the model will be studied. The overall management system will be illustrated in scope of predictive maintenance philosophy and reliability for all offshore structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call