Abstract
<p>Automated monitoring systems are being increasingly used on long-span bridges to address a wide range of challenges, such as those encountered during the construction stage or those associated with maintenance and life-cycle optimization. Bridge designers are now more prepared than in the past to consider the use of SHM systems in their work from an early stage, and to support contractors in implementing such systems during the construction stage. Close coordination between bridge designers, contractors and SHM specialists enables the appropriate equipment to be integrated wisely in the construction process, and ensures that full advantage may be taken of the benefits that can be gained from the use of an SHM system, right from the start of the bridge’s life cycle. This can be particularly important, for example, where components of the SHM system require to be embedded in a structure’s concrete during the construction stage, or where the system will play a significant data measurement and assessment role in the construction process as a whole. This is illustrated with reference to current bridge construction projects in India and Canada.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.