Abstract

This paper introduces an integrated model that merges three key concepts: quality control through linear profile monitoring using Hotelling's T2 control chart, production cost evaluation, and maintenance policies. The objective function of the integrated model is to minimize total costs. This study is the first to jointly consider production and maintenance costs in the framework of profile monitoring using Hotelling’s T2 control chart for linear profiles without compromising on the versatility of simple linear profiles as a modeling tool, particularly in calibration applications. Appropriate assumptions are made for the proposed integrated model and the particle swarm optimization algorithm is implemented to determine decision variables. To evaluate the effectiveness of the integrated model, a numerical example and a comprehensive comparative analysis are conducted. Moreover, a sensitivity analysis to study the effects of various input parameters on the optimal solutions is performed. The findings suggest that adopting the integrated model with specific decision variables results in lower expected total costs when compared to the joint model and fixed parameter schemes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.