Abstract

This paper deals with joint optimization of production scheduling and group maintenance planning in single machine system with multi units arranged in series. The objective is to achieve optimum production sequence, preventive maintenance (PM) intervals and grouping of units which minimize the total integrated cost per unit time of the system. Teaching-Learning Based Optimization (TLBO) algorithm is applied to optimize the objective function. The peculiarity of TLBO as against other algorithms is that it is independent of algorithm specific parameters. The largest order value rule is utilized to retrieve the permutation vector while grouping of units is performed under PM intervals. Computational results reveal the effectiveness of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.