Abstract
Integration of process planning with scheduling by considering the manufacturing system's capacity, cost and capacity in its workshop is a critical issue. The concurrency between them can also eliminate the redundant process and optimize the entire production cycle, but most integrated process planning and scheduling methods only consider the time aspects of the alternative machines when constructing schedules. In this paper, a fuzzy inference system (FIS) in choosing alternative machines for integrated process planning and scheduling of a job shop manufacturing system is presented. Instead of choosing alternative machines randomly, machines are being selected based on the machines reliability. The mean time to failure (MTF) values is input in a fuzzy inference mechanism, which outputs the machine reliability. The machine is then being penalized based on the fuzzy output. The most reliable machine will have the higher priority to be chosen. In order to overcome the problem of un-utilization machines, sometimes faced by unreliable machine, the particle swarm optimization (PSO) have been used to balance the load for all the machines. Simulation study shows that the system can be used as an alternative way of choosing machines in integrated process planning and scheduling.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.