Abstract
Installation, detection, maintenance, mapping, and management of underground utility assets present challenges to owners, engineers and contractors. Industry-wide practices include the use of geophysical and similar technologies to determine depth and location, and 2D as-built plans integrated with GIS databases for information management. The feasibility of incorporating 3D BIM models of the subsurface to replace the 2D plans to improve visualization and data management is examined in this paper. Obtaining an accurate image of the underground infrastructure would help minimize excavation accidents due to equipment-utility collisions and prevent property damage. Further, the inclusion of automated data collection and sharing features realized through BIM technology can enhance operations of smart cities. The research methodology consists of a state-of-the-art review of the current underground utility management systems, combined with statistical analysis of survey responses received from utility providers and one-call centers in the U.S. Three categories of utility practices are identified based on the level of digital technology integration. It is found that a vast majority of utility firms have adopted GIS databases with 2D plans, depth and other asset information, while a smaller percentage of providers have achieved full GIS-BIM integration, incorporating a wide range of asset data. Future progress on broader implementation appears to be constrained by the digital literacy of personnel and high costs of technology acquisition and application. A three-step framework for converting 2D plans to 3D BIM models is also presented and discussed. The process model proposed for this purpose allows the utilization of commercially available software with minimal need for additional coding.
Highlights
The feasibility of incorporating 3D Building Information Modeling (BIM) models of the subsurface to replace the 2D plans to improve visualization and data management is examined in this paper
It can be observed in this figure that 90 percent of the companies surveyed record the date of utility installation onto their Geographic Information Systems (GIS) database, and 80 percent of them maintain information on the content of their utility lines
Survey results revealed that information in the databases may be updated at varying frequencies, with 13 percent of the respondents declaring updates being done during asset maintenance, 29 percent saying daily, and 58 percent indicating monthly
Summary
The feasibility of incorporating 3D BIM models of the subsurface to replace the 2D plans to improve visualization and data management is examined in this paper. Achieving this objective will improve safety of excavations associated with underground utility locating and mapping while preventing property damage. Accurate determination, recording, and management of key information (location and attributes) pertaining to this vast infrastructure network often present challenges because of the difficulty of direct physical access to the underground and the elevated costs of establishing and maintaining an up-to-date database. Changes in topography due to new construction, renovation and maintenance, ground erosion, along with the limitations of the detection equipment and human errors in locating the utilities, compromise the accuracy of mapping the underground space [2]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.