Abstract
Construction simulation and traffic simulation are complementary to successful planning of microtunneling and pipe-jacking operations in urban areas. With increasing concerns on sustainable development, it is imperative to integrate construction engineering and traffic engineering in simulation modeling in order to plan for efficient site operations while reducing the impact of construction upon traffic. In this research, we demonstrate a "larger system simulation" approach to effectively plan pipe-jacking operations in urban areas in considerations of (1) truck delivery routes and timing; (2) sizing and location of temporary laydown area on site; (3) traffic lane closure distance; and (4) working hours scheduling, aimed at minimizing the negative impact of construction on traffic. Our research goal is to deliver a temporary traffic arrangement plan along with an efficient site operations plan, thus keeping a balance between construction productivity and traffic mobility. A case study is given based on a pipe-jacking site in the urban area of Hong Kong.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.