Abstract

This paper describes the adaptation of process plan with alternatives, through an operation-based time extended negotiation protocol for decision-making about real-time routing of job orders of parts composed of machining operations in a job shop environment. The protocol is modified from the contract net protocol to cater for the multiple tasks and many-to-many negotiations. The grouping of the machining operations enables reduction of setup times, resulting from the reduction of machines changes. The time-extended negotiation period allows the visualisation of all the times involved in the manufacture of each part, including those times that are not considered in systems of this nature, such as the negotiation times among agents. Extensive experiments have been conducted, and the performance measures, including routings, makespan and flow time, are compared with those obtained by the following approaches: traditional hierarchical approach, a cooperative coevolutionary algorithm and the search technique based on a coevolutionary algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.