Abstract

Currently, computer-aided tools for system analysis are distinct from project management tools. This study proposes and prototypes a model that integrates these two aspects of the Information System Life Cycle (ISLC) by automatically mapping system analysis objects into project management objects. To validate the feasibility of our model and without loss of generality, the conversion of Data Flow Diagrams (DFD) objects into Gantt and Pert diagrams is demonstrated in this study. Experiments with the prototype confirm that integrating common tools for system analysis and standard tools for project management, during system development, helps improve system building tasks and their management. In addition, project managers using the proposed mapping approach can better assess project duration and system performance parameters such as response time and data traffic. We address implications of our work to both academics and practitioners, discussing directions future research might take as well as opportunities and prospects for commercialization of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.