Abstract

We consider a simple multi-stage assembly system, with stationary stochastic demand for a single final product that is made-to-stock. The assembly tasks are performed by human resources. This workforce consists of two parts: regular workforce with a long-term contract and temporary workforce, that are contracted based on the actual demand. Contracting resources early is always cheaper than contracting later. When we separate resource and production decisions, we can first determine order-up-to levels and production decisions in a standard way and afterwards find the best mix of regular and temporary workforce. Next to this decoupled approach, we present an integrated approach where these decisions influence each other. In a set of examples we show that the integrated approach can be very beneficial.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.