Abstract

Climate change pushes the operation managers to take account of energy-saving issues in their decision-making of production scheduling and maintenance planning (PSMP). We address a PSMP problem for a single machine system under Time-of-Use electricity tariff. We consider two objectives including the makespan that measures the service level and the total energy cost that measures the energy sustainability. Both objectives are considered in a bi-objective mathematical model that is further solved using a novel heuristic algorithm consisting of two layers based on the problem decomposition. The inner layer problem, which is solved by a branch & bound algorithm, is to optimise the decision variables of preventive maintenance and machine’s setup. The outer layer problem, which is solved by a hybrid NSGA-II algorithm, is to optimise the sequence of jobs and the amount of inserted buffer time. The effectiveness and efficiency of the algorithm are demonstrated by a series of numerical experiments. The Pareto frontier can serve as a tool for managers to consider energy cost explicitly in making decisions. It is observed in some scenarios that reducing energy cost will not increase the makespan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.