Abstract

This paper presents a new method with integration of generation and transmission networks reliability for the solution of unit commitment (UC) problem. In fact, in order to have a more accurate assessment of system reserve requirement, in addition to unavailability of generation units, unavailability of transmission lines are also taken into account. In this way, evaluation of the required spinning reserve (SR) capacity is performed by applying reliability constraints based on loss of load probability and expected energy not supplied (EENS) indices. Calculation of the above parameters is accomplished by employing a novel procedure based on the linear programming which it also minimizes them to achieve optimum level of the SR capacity and consequently a cost-benefit reliability constrained UC schedule. In addition, a powerful solution technique called “ integer-coded genetic algorithm (ICGA)” is being used for the solution of the proposed method. Numerical results on the IEEE reliability test system show that the consideration of transmission network unavailability has an important influence on reliability indices of the UC schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.