Abstract
This paper presents an overview of the efforts associated with integrating a new torque measurement system for T408 engines into an NCH-47D airframe and performance of the torque measurement system during operation on the aircraft. The effort described was performed collaboratively between GE Aviation, The Boeing Co, Parker LORD, and DEVCOM AvMC. The Torque Measurement System was utilized in the T408 Engine Control System during its demonstration on an NCH-47D airframe at Ft. Eustis, VA. In addition, based on DEVCOM AvMC program requirements, health monitoring capability was successfully implemented and demonstrated during the NCH-47D T408 Engine Demonstration. Lessons learned from the torque measurement system's health monitoring features are included.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.