Abstract

Integrated 3D modeling adaptation to infrastructure has been slow due to technical challenges, such as the lack of interoperability between software. To fill this gap, a versatile model with 3D modeling capabilities was developed to assist in designing sustainable bridges at the conceptual design stage. The model incorporates a rule-based expert system and four modules, namely, 3D CAD modeling, bridge sustainability rating system (BrSRS), bridge environmental performance strategy mapping (BrEPSM), and conceptual cost estimation. The 3D CAD module was developed using the Graphics.DrawLine method. The BrSRS and BrEPSM modules were developed by amalgamation of the identified pertinent sustainable and footprint indicators. The model aims to provide bridge type recommendations, allow customization of a sustainable bridge, illustrate forecasted footprint levels, present the conceptual design in AutoCAD’s 3-dimensional (3D) mode, facilitate a recalculation process when the bridge’s dimensions are altered, and generate a conceptual cost estimate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.