Abstract

Aims: This study aims to develop an integrated system for accurate electrical measurement monitoring.
 Study Design: The acquisition embedded system is developed using research and development study.
 Place and Duration of Study: Department of Machinery Automation System, Polytechnic ATI. Makassar, Indonesia, between March 2021 and October 2021.
 Methodology: The performance of the proposed integrated acquisition embedded system and conventional measurement is compared through different testing.
 Results: The results showed that the device worked as expected and was right on target. The device test error is compared with direct measurement with the measuring instrument; the voltage error is 0.17%, the current error is 0.46%, the power error is 0.89%, and the frequency error is 0.01%. System devices can measure and monitor several electricity measurements.
 Conclusion: The experimental results show that the system can function correctly. The integrated acquisition system can operate with great accuracy. This study is expected to contribute to establishing a system that will benefit the government's efforts to preserve energy efficiency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call