Abstract
In order to effectively allocate processes of Aa single complex product to two workshops with the same equipment, an integrated scheduling algorithm of two workshops based on process end time driven and processing area priority is proposed. To optimize the total processing time, a process scheduling strategy based on process end time driven is proposed. By scheduling multiple devices at the same time, the parallelism of process execution is improved, in order to reduce the total processing time and improve the utilization rate of equipment. In order to optimize the process migration times between two workshops, a workshop assignment strategy based on process processing area priority is proposed, which comprehensively considers the influence of the immediate preceding process, neighbor process and friend process of the schedulable process on workshop assignment and makes the process in the same processing area be processed in the same workshop as much as possible, so as to reduce the process migration times. The example analysis shows that the proposed algorithm is superior to the existing two workshops integrated scheduling algorithms in terms of reducing the total processing time, reducing the process migration times, and improving the utilization rate of equipment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.