Abstract

The goal of this research is to apply risk management model related to the Occupational Health and Safety (OHS) by integrating Causal Effects Diagram ( CED), Analytic Network Process (ANP) and Interpretive Structural Modeling (ISM). The research method consists of three (3) stages. Stage 1) Using CED method to know the correlation between the risks and their causes. Stage 2) Making an assessment by using Analytic Network Process (ANP) with Software Matlab, stage 3) Interpretive Structural Modeling (ISM) is used to get the model of connectivity in mitigation of occupational accident. From ANP method, it is clear that the dominant potential risk in structural phase is 44% and the highest cause of accident by human factor is 77%, and it is due to the unsafe behavior. ISM method is used to know the mitigation in reducing the occupational accident risks, namely improvement of Occupational Health and Safety (OHS) management, Each Scaffolding establishment must be inspected by a certified expert, the working methods must obey the Indonesian National Standard (SNI), The risk control should be done in relation to potential cause of occupational accident which can minimize the risk on construction work ( zero accident ).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.