Abstract

To meet utility demands some industrial units use onsite utility system. Traditionally, the management of such type of industrial units is carried out in three sequential steps: scheduling of the manufacturing unit by minimizing inventory, estimating the utility needs of manufacturing unit and finally operation planning of the utility system. This article demonstrates the value of an integrated approach which couples the scheduling of manufacturing unit with operational planning of the utility system. A discrete-time mixed integer linear programming (MILP) model is developed to compare traditional and integrated approaches. Results indicate that the integrated approach leads to significant reduction in energy costs and at the same time decreases the emissions of harmful gases.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call