Abstract

Modular plug-and-produce production systems have been proposed as promising architectures to face the challenge of evolving market requirements, large product variety and small lots. These systems enable fast reconfiguration through on-line production modules substitution. However, such capability poses challenges at planning level, as the sequencing of lots and the selection of production modules need to be performed simultaneously. This paper proposes an integrated method for production and reconfiguration planning combining stochastic lot completion time distribution analysis and lot sequence optimization to maximize the system service level. The approach is validated in a real industrial system producing hydraulic valves.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.