Abstract

We consider a single period inventory problem in which a supplier faces stochastic demands and customer specific waiting costs from multiple customers. The objective is to develop integrated production, allocation, and distribution policies so that the total production and customer waiting costs are minimized. We present an optimal policy for the two customer problem and derive a heuristic for a general problem based on the structural results of the two customer case. We show, numerically, that the heuristic performs very well with error bounds of less than 2% on average, while typical approximations may lead to significant sub-optimality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.