Abstract

Process planning, scheduling and due-date assignment are three important manufacturing functions in our life. They all try to get local optima and there can be enormous loss in overall performance value if they are handled separately. That is why they should be handled concurrently. Although integrated process planning and scheduling with due date assignment problem is not addressed much in the literature, there are numerous works on integrated process planning and scheduling and many works on scheduling with due date assignment. Most of the works in the literature assign common due date for the jobs waiting and due dates are determined without taking into account of the weights of the customers. Here process planning function is integrated with weighted shortest processing times (WSPT) scheduling and weighted slack (WSLK) due date assignment. In this study unique due dates are given to each customer and important customers gets closer due dates. Integration of these three functions is tested for different levels of integration with genetic algorithms, evolutionary strategies, hybrid genetic algorithms, hybrid evolutionary strategies and random search techniques. Best combinations are found as full integration with genetic search and hybrid genetic search. Integration of these three functions provided substantial improvements in global performance.

Highlights

  • Process planning, scheduling and due date assignment are treated sequentially and separately

  • If we look at the literature we can find numerous works on integrated process planning and scheduling (IPPS) and scheduling with due date assignment (SWDDA)

  • If we look at SWDDA problems we see that most of the works are done on common due date assignment

Read more

Summary

Introduction

Process planning, scheduling and due date assignment are treated sequentially and separately. Predetermined process planning, scheduling and due date assignment can cause poor global performance and can be a poor input to the downstream functions. If we search for works on integrated process planning, scheduling and due date assignment (IPPSDDA), only a few studies were found in the literature. We integrated weighted shortest processing times (WSPT) scheduling with weighted slack (WSLK) due date assignment and process plan selection. After representing the problem as a chromosome we gave a higher probability of selection for dominant genes which are due date assignment and dispatching genes Because these genes greatly affect the performance measure compared to any job route. We wanted jobs to be completed as close as possible to given reasonable due dates and tardiness is penalized more compared to earliness. Integrated process planning, WSPT scheduling and WSLK due-date assignment using genetic algorithms... Integrated process planning, WSPT scheduling and WSLK due-date assignment using genetic algorithms... 75

Literature survey
Problem studied
Used techniques
Method WSLK RDM
Solutions compared
Experiments and results
Findings
Discussions and conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.