Abstract

The electric power industry worldwide has been focusing towards increasing utilization of renewable energy resources such as wind and solar to build and maintain clean, reliable and affordable electricity systems. Although these resources are environmentally clean, their uncertain and intermittent nature is a significant issue. Similarly, other energy generators such as nuclear and gas have serious environmental issues. These issues can be resolved with effective management of supply and demand using appropriate energy storage. Although various energy storage options are available, PHES is globally proven technology at grid level. Additionally, gravity power module (GPM) is a newly emerged technology in the power industry. However, its applications at full scale are still awaited. This research developed methodologies for integrated planning framework for PHES systems at grid level, employing a GIS-based model to identify feasible PHES sites, optimizing the scheduling of feasible PHES potential, and performing the financial analysis of PHES system. The methodologies were applied on grid-connected electricity area of Ontario that identified 285 feasible PHES and GPM sites with storage potential of 56,268 MWh. This research proposed the formation of a cooperative association namely „Pumped Hydro Storage Association (PHSA)‟ for integration of PHES system in the electricity market system operated by the IESO in Ontario. Using 2016 data, the optimization model resulted that PHSA supplied real-time energy 28,134 MWh/ day, provided ancillary services including variable operating reserve 23,914 MWh/ day, fixed operating reserve 4,220 MWh/ day, and purchased energy 65,060 MWh/ day. The optimization results and resultant financial indicators confirmed that proposed PHES system is technically and financially viable in a large electricity market system. As an initial step, partial development of PHES and GPM plants was proposed with an initial capital cost of C$ 1,052 Million utilizing 7,767 MWh/ day energy potential that resulted in a net profit share of C$ 13.36/ MWh for each participatory plant. Finally, the developed PHES planning framework for PHES system can certainly be found valuable to the policymakers, system operators, energy developers, research scholars, engineers, financial analysts and scientist community to work on future improvement in the PHES system.

Highlights

  • 1.1 BackgroundThe electric power industry has been focusing worldwide towards increasing utilization of renewable energy resources in efforts to build and maintain a clean, reliable and affordable electricity system

  • 6.1 Conclusion This research study applied a systematic approach for developing an integrated planning framework of Pumped Hydro Energy Storage (PHES) system in the grid-connected electricity market of international standard that was tested on a case study of the Province of Ontario, Canada

  • The critical analysis of this study stems that PHES is a viable means of storing unutilized energy generation from surplus baseload generation of primary generators including the renewables

Read more

Summary

Introduction

The electric power industry has been focusing worldwide towards increasing utilization of renewable energy resources in efforts to build and maintain a clean, reliable and affordable electricity system. With backup support of an energy storage facility, the industry can develop and maintain a reliable delivery network to meet the peak hour demand. The optimization of feasible PHES potential in a particular electricity market region at grid level is followed by the financial analysis to test the financial viability of the PHES system. The services of PHES plants were used on a rental basis without considering the techno-economic aspects of the PHES system. These gaps are highlighted for other past studies in the literature review chapter

Methods
Results
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.