Abstract

This paper presents a new mathematical formulation for planning and scheduling activities of Engineer-To-Order (ETO) projects. It includes a new ETO strategy to reduce two principal impacts of the design uncertainty inherent in the ETO context: waste (of time and resources) and schedule instability. Our optimization approach is based on a two-level decision process to address, either sequentially or separately, the initial planning and the rescheduling stages. We also propose a hybrid Layered Genetic Algorithm combined with an adaptive Lamarckian learning process (LLGA). LLGA uses a new genetic representation (encoding format and decoding method) and a new cycle-avoidance procedure that guarantees solutions feasibility. LLGA is compared to the branch-and-cut procedure of CPLEX run on the proposed mathematical model on randomly generated instances with up to 340 operations. Our mathematical model shows a good performance for small and medium-sized instances, especially for the rescheduling stage. This performance deteriorates for larger instances (larger computing times and out-of-memory problems). However, the proposed heuristic is computationally stable and yields good-quality solutions in a reasonable computing time without requiring a large memory space. Our experiments also demonstrate the merits of our new ETO strategy in improving the robustness of the solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.