Abstract

Most of papers that deal with the production planning problems assume that the equipments are always available during the scheduling horizon, however, preventive maintenance activities cost time that could otherwise be used for production, but delaying preventive maintenance for production may increase the probability of equipment failure. In order to resolve the conflict between preventive maintenance planning and production scheduling and find a balance point between the two, an integrated optimization strategy is proposed in this paper. Firstly, a preventive maintenance model and a production scheduling model are developed independently to minimize the total cost of the manufacturing system, then an integrated model is presented with the same objective. In this paper, we assume that the effect after preventive maintenance is not 'as-good-as-new' but imperfect which can be described by an improvement factor. Finally, a numerical example of system optimized with adaptive genetic algorithm is discussed, the results show that this optimal integrated policy is much more practical than the optimal maintenance planning and sequence decision given by the independent models, and it can provide decision support for the two.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.