Abstract

Adjusting the timetable and speed profile of trains can bring significant reduction in energy consumption, which is almost zero cost to the subway operating company. This paper proposes an integrated optimization method for a single train, to simultaneously obtain the optimal speed profile and the interstation trip time distribution of the whole journey by dynamic programming (DP). With modeling the traction power supply system (TPSS), the practical location of substations is considered, which can achieve the whole journey energy minimization at substation level by the designed DP algorithm. Practical data from Guangzhou Metro Line 8 is applied to validate the proposed methodology in the case study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.