Abstract
A joint optimization model of maintenance and operation of high-speed train fleets is established with the optimization objective of minimizing the total costs, considering dynamic passenger flow and maintenance resources. A new maintenance strategy CCPM (Coordinating Conflicts Preventive Maintenance) is proposed to optimize the problem. The effectiveness of the model and the strategy are verified by numerical examples. The comparison between the strategy in the paper and the existing approach proves that the new strategy is more effective and shows the importance of considering dynamic passenger flow. The model and the strategy provide decision support for the actual high-speed trains operation and maintenance program. This study also offers new ideas to the subsequent research on preventive maintenance of high-speed trains.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Eksploatacja i Niezawodność – Maintenance and Reliability
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.