Abstract

Multiple cracking furnaces in an ethylene plant run in parallel to produce ethylene, propylene, and other products from different hydrocarbon feedstocks. Because both coke formation in radiant coils and change of operation conditions with time have significant effects on the performance of cracking furnaces, it is better for the cyclic scheduling to be simultaneously optimized with the operation conditions. To match this real requirement, a mixed-integer dynamic optimization (MIDO) problem is presented for the optimization of both operation conditions and cyclic scheduling simultaneously, through which the optimal assignment, the processing time, the subcycle number, and the optimal operation conditions of different feeds in different cracking furnaces are determined at the same time. To solve the MIDO problem, it is discretized and converted into a large scale mixed-integer nonlinear programming (MINLP) problem. The two scheduling cases of a cracking furnaces system are illustrated showing a remarkable i...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.