By maximizing offsite work and minimizing onsite activities, modular construction has become increasingly popular in high-rise, high-density cities. For successfully delivering high-rise modular buildings, a key issue is the effective scheduling of offsite logistics, consisting of module manufacturing, transportation, and storage. This paper proposes an integrated offsite logistics scheduling approach for high-rise modular building projects that addresses project-specific constraints and uncertainties, based on the stochastic Petri net (SPN) method. The proposed approach supports multi-criteria decision-making, that considers completion time, total cost, storage capacity utilization, and production process stability under what-if scenarios. Its efficacy and novelty for offsite logistics scheduling were demonstrated through a real-life project case study. The results indicate the need to (1) strengthen suppliers’ demand responsiveness by shortening module production time; (2) enhance manufacturing flexibility by increasing factory storage utilization; (3) improve supply chain synchronization; and (4) capitalize on the government’s role in offsite logistics enhancement. The findings methodologically innovate offsite logistics scheduling, and practically support contractors and module suppliers in successfully delivering high-rise modular building projects in high-density cities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.