Abstract

Abstract Asri basin has been on producing since July 1989, currently there are 9 fields has been developed with strong water drive reservoir driving mechanism characteristic. Peak production was 196,000 bopd, presently producing 34,000 bopd with water cut of 99 %. Challenge faced in the studies had to deal with mature reservoir, declining production, depleted reservoir pressure, unrealistic recovery factor and the need to enhance asset value. Beyond that complexity, commercial challenge in rejuvenating the field becoming more critical due to falling oil prices. This paper present how integrated evaluation of mature offshore oil field performance and investigated various scenarios could add more value to the asset. Water flood, water shut off, and single field revitalization project has been implemented and it shows satisfaction result in reducing and maintaining production decline rate even increasing oil production volume. Recommendations also made to sustain and gain oil production by implementing successful projects to other field and also trying to implement Polymer Injection pilot project in Indonesia. The important thing in revitalizing a mature field is to define a customized asset evaluation approach to managed large amounts of data and identify the most important mechanisms in creating value-added solutions, while minimizing costs. The team captured this through innovative systems planning and operation, displacing the traditional lab-to-field R&D search in that multiple options were generated from within functional technology contributions. As expected, the results of full project implementation are satisfying. Depleted reservoir problem in major field producer has been solved by water flood project, the pilot project has been conduct in 1999 and shows great result in increasing oil production rate, within 2 years the oil production rate increase from 2,000 bopd to 12,000 bopd. Another project has been implemented in this major field is facies re-analysis, from this analysis new map are created, therefore new point of view can be extracted to support more comprehensive analysis, and the new analysis are very useful to gain oil production. Marginal field also part of the revitalization program in Asri Basin, in 2012 rejuvenation project has been conducted, and the result shows 4 times oil rate incremental, from 264 bopd to 908 bopd. One of other successful project is water shutoff, 2 wells are implemented for this project, and it can reduce water cut up to 17%, from 99% to 82% water cut. Those successful projects will be implemented for other field in Asri basin North Business Unit Area to Sustain and Gain Oil Production Rate.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call