Abstract
The State of Washington has found that the Spokane River is DO impaired, and is requiring dischargers to reduce phosphorus inputs to the river. Spokane County elected to build a new water recovery facility with a target effluent total phosphorus level of 50 microg/L on a seasonal average basis. Spokane County elected to use a private company to design/build and operate their facility. The very low nutrient requirements, and lack of historical operating information, necessitated an integrated approach to the nutrient removal design while considering the risks and benefits of the various treatment options. The process selection evaluated membrane bioreactors and tertiary membranes for the primary liquids process in combination with chemical and/or biological phosphorus removal. The final process selection included chemically enhanced primary treatment, membrane bioreactor with metal salts, and dewatering liquor treatment with an innovative post aerobic digestion step.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.