Abstract

Modeling method based on network diagram was proposed to realize integrated modeling of process routes planning and scheduling. A model of multiple process routes and resource (MPRR) network diagram was built, which applied the network diagram expression and represented the precedence constraint relationship among operations and resource conditions. In the model, the workpiece, operation and machine are joined together as a basic optimization cell to realize concurrent and holistic optimization for process routes planning and scheduling. An example was studied and the integrated model of process routes planning and scheduling was built.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.