Abstract

Herein we provide an operational sequence indentifying a set of future roles and responsibilities for Air Navigation Service Provider (ANSP) and flight operator staff. It also identifies procedures and technologies necessary to support activities proposed withing future operational concepts for an Integrated Arrival/Departure Control Service, Dynamic Departure Routing, and airport surface management, with a focus on near- to mid-term (2015–2018) technical capabities. This operational sequence is then utilized to identify critical human factors considerations at an abstract level. The operational sequence is organized according to a timeline and the assumed context for the scenario. All times are reported in Zulu (Greenwich Mean) Time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.