Abstract

An integrated model for line planning and train scheduling based on the circulation of trains is proposed to reduce passenger dissatisfaction and operation costs for an urban rail transit line. The turnaround operations of trains and their departures from and arrivals at the depot were included in this model. Furthermore, binary variables were introduced to indicate whether train service existed, and a discrete event model was used to determine the order of the train services. In addition, a bi-level optimization approach is proposed to solve the integrated line-planning and train-scheduling problem, in which the number of required train services, the headways between train services, the departure times, and the arrival times were optimized simultaneously on the basis of passenger demand. The performance of the proposed integrated model and bi-level approach is illustrated with a case study of the Beijing Yizhuang line.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.