Abstract
In manufacturing cells layout design with a unidirectional flow system, the accurate distance between two workcells can be uncovered with both the determination of IO port locations after the layout design of the cell with its orientation and the unidirectional flowpath layout design. This paper presents the method to obtain a global solution for manufacturing workcells and unidirectional flowpath layout design (ICFLD) with consideration of IO ports of workcells. The flow distance between two workcells is calculated from output port of one workcell to input port of the other workcell through the unidirectional flowpath layout. A zero-one integer programming model is developed for the ICFLD problem. And a heuristic algorithm for the ICFLD problem is developed by decomposing the ICFLD problem into two subproblems and iteratively and alternately solving the decomposed subproblems. Computational experiments are performed and its results are analyzed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.