Abstract
Efficient resource management methods are essential for spare parts used in the maintenance and repair of equipment. Forecasting plays a critical role in planning, especially under demand uncertainty. Existing works regarding spare parts with intermittent demand focus on the mere forecasting model while integrating the planning and forecasting models are not sufficiently investigated. We examine the interaction between two models to optimise planning and forecasting decisions and prevent sub-optimality. This paper presents two mathematical models, including a planning model that determines stock level, spare part order assignment to suppliers, equipment repair assignment, and the number of intervals over the planning horizon. The second model is the forecasting model by Support Vector Machine (SVM). Considering uncertainty, demand estimation is performed by piecewise linearisation considering the optimal number of intervals in the planning model used in forecasting. An interactive procedure is developed to optimise models. We use an empirical investigation from an oil company providing the spare part supply chain data. The analyses show that demand estimation by piecewise method and integrating the decisions optimises the cost, improves the forecasting accuracy, and planning performance. Moreover, we offer several insights to practitioners that shed light on spare part planning and forecasting decisions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.