Abstract

We model a make-to-stock production system that utilizes permanent and contingent capacity to meet non-stationary stochastic demand, where a constant lead time is associated with the acquisition of contingent capacity. We determine the structure of the optimal solution concerning both the operational decisions of integrated inventory and flexible capacity management, and the tactical decision of determining the optimal permanent capacity level. Furthermore, we show that the inventory (either before or after production), the pipeline contingent capacity, the contingent capacity to be ordered, and the permanent capacity are economic substitutes. We also show that the stochastic demand variable and the optimal contingent capacity acquisition decisions are economic complements. Finally, we perform numerical experiments to evaluate the value of utilizing contingent capacity and to study the effects of capacity acquisition lead time, providing useful managerial insights.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.