Abstract
Purpose: To solve the problems of low integration accuracy and long integration time of traditional prefabricated construction information integration methods. Method: A method of assembling building information integration based on BIM and RFID technology was proposed. By analyzing the information integration principle of BIM RFID (Building Information Modeling Radio Frequency Identification) technology, starting with rfid technology, we use rfid technology to collect the information of prefabricated building components and obtain the coding information of component data. Experiment: Combining Markov model and fuzzy algorithm, the obtained coding information is preprocessed. According to the processing results, statistical feature clustering algorithm is introduced to integrate the construction information of prefabricated buildings. Result: The precision polyline of the prefabricated building construction information integration method based on BIM and RFID technology showed a steady increase, and it was close to 100% in the later stage. At the same time, the time consumed by this method was within 0.41 s, with high accuracy, high efficiency and high practicability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Computational Methods in Sciences and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.