Abstract
Based on the experimental study, summarizes the disadvantages of the test roof; On the same premise of the roof to keep the overall appearance, the structural system of the roof is optimized ; The content of the optimized structural system includes the layout of the structural system, the establishment of the calculation model, the optimization of internal support system, the calculation of kinds of members, etc.; The integrity of the roof are enhanced after optimization, and more accord with the concrete shell space structure characteristics, and provided a convenient for the big water construction. Compared to the traditional roof, the optimized roof save about 30% of the costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.