Abstract

AbstractThis paper presents the integral lifting and seismic isolation retrofit of the great hall of Nanjing Museum, a 78-year-old cultural and historical building. Due to the need for extension, the great hall of the Nanjing Museum needed to be lifted 3.0 m. The total building area for lifting was 4,830 m2, with a total of 161 lifting points, which made this project quite challenging and also the largest done to date. Moreover, seismic isolation retrofit was utilized to improve the seismic performance of the translocated building. Details of the integral lifting and the seismic retrofit are presented in this paper, which include (1) the load underpinning system, (2) the spatial strengthening truss system, (3) the lifting control system, and (4) the base isolation using laminated rubber isolators. The entire lifting system performed well, and the main construction was finished within 5 months. Seismic time-history analyses were further performed to evaluate the effect of the seismic isolation. It was obse...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.