Abstract

The steel plate yard of shipbuilding separates the inbound and pre-processing operations, increasing the number of moves. This paper considers the mixed inbound and pre-processing operation and studies the stack inbound and pre-marshalling problem where storage and relocation moves can alternate. This problem aims to find a minimum operation to store all inbound plates while eliminating all blocking plates. We propose a novel integer programming model combining two moves in one time period. This model reduces the number of periods, thereby decreasing the model size, but requires extra constraints to avoid infeasible patterns. An exact branch-and-cut algorithm is introduced to tackle the influence of these extra constraints. This paper provides a new modeling approach for stack-related problems, and the experiments show that the proposed method outperforms other ILP-based methods in the literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.