Abstract
The study was an attempt to develop the model of a decision controller allowing for simultaneous optimisation of the stock of semi-finished product generated during cutting and cut-out waste. The proposed decision controller was designed to select a suitable cut-out programme to account for such factors as: production orders, current stock of semi-finished product, minimum stock limits, the set limit of rejects. The elaboration concerns application of integer linear programming in multicriteria optimisation in constraint.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have