Abstract

The study was an attempt to develop the model of a decision controller allowing for simultaneous optimisation of the stock of semi-finished product generated during cutting and cut-out waste. The proposed decision controller was designed to select a suitable cut-out programme to account for such factors as: production orders, current stock of semi-finished product, minimum stock limits, the set limit of rejects. The elaboration concerns application of integer linear programming in multicriteria optimisation in constraint.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call